ONTARIO REGULATION 278/05
DESIGNATED SUBSTANCE — ASBESTOS ON CONSTRUCTION PROJECTS AND IN BUILDINGS AND
REPAIR OPERATIONS
CONTENTS
- Definitions
- Application
- Adoption of standard
- Restrictions re sprayed material, insulation, sealants
- Information for workers
- Demolition
- Ongoing asbestos management in buildings, two-year transitional period
- Ongoing asbestos management in buildings after transitional period
- Responsibility of employer other than owner
- Owner’s responsibilities before requesting tender or arranging work
- Advance notice re Type 3 operations and certain Type 2 operations
- Type 1, Type 2 and Type 3 operations
- Respirators
- Measures and procedures, Type 1 operations
- Measures and procedures, Type 2 and Type 3 operations
- Additional measures and procedures, Type 2 operations
- Additional measures and procedures, glove bag operations
- Additional measures and procedures, Type 3 operations
- Instruction and training
- Asbestos abatement training programs
- Asbestos work report
- Asbestos Workers Register
- Use of equivalent measure or procedure
- Notice to inspector
- Table 1
Bulk material samples
- Table 2
Respirators
- Table 3
Air samples